The Problem:
The
problem was related to pipe corrosion
in the piping system in the Outpatient
and Administrative Building’s
chilled water and heating system.
The heating system had an operating
temperature of about 180° F.
|
|
|
|
|
The Problem:
The
problem they were experiencing was
related to pipe corrosion in the
piping system in the facilities chilled
water and heating system. The two
pipe heating- cooling system was
made of Schedule 40 black steel main
lines with soft copper branch lines.
Pipe diameters ranged from a half-inch
to 21⁄2 inches.
|
|
|
|
|
|